HOMECONTACT US

PRESS RELEASE

< GO BACK
Gold Coast Water / Abigroup award Coe Driling Nerang River Crossing 1 December 2007
Coe Drilling has recently been awarded the design and construction of the Nerang River Crossing. The project involves the installation of a 960OD MSCL Pipeline 140m in length.
< GO BACK